- 42,000 mt bulk coal 5% Mol
- Bengkulu /
- 6,000 mt / 10,000 mt pwwd shinc bends.
- Laycan: 20th - 25th sept 2011
- Vsl to be geared with grabs on board
- Inviting Owrs best on fiost
- Chrts pfma cp dtls
- Ttl: 5%
- 42,000 mt bulk coal 5% Mol
- Bengkulu /
- 6,000 mt / 10,000 mt pwwd shinc bends.
- Laycan: 20th - 25th sept 2011
- Vsl to be geared with grabs on board
- Inviting Owrs best on fiost
- Chrts pfma cp dtls
- Ttl: 5%
quantity - 50000mt 10% moloo iron ore
load port - goa (12.8 mtrs draft, loa 190 m)
disc port - china range
load rate - supra - 7000mt pwwd shinc
disc rate - 14000mt pwwd shinc
laycan - 10/15 sept
addcom - 3.75% past us
-CGO:50000MT STEAM COAL IN BULK WZ 10% MOLOO,
-1SAP PROVINSI BENGKULU,INDONESIA/1SBP
-6000/12000 PWWD SHINC,
-20--25,SEP,2011,
-3.75 ADD.
-50K N.ORE IN BULK, 10PCT MOLOO,
-1SAP POMALAA OR KOLAKA / 1SBP N.CHINA,
-5K/12K,
-SEP 15-20,
-INVITE OWNERS FRT RATE,
-3.75% OR NILL,
-12HRS SUB.
-60,000MT COAL IN LUMP, 10PCT MOLOO,
-1SBP/SAP
-20,000MT PWWD SHINC / 20,000MT PWWD SHINC,
-LAYCAN: 15-20TH SEP (LATER NOT WORKABLE),
-USD xx PMT FIOST BSS 1/1,
-3.75% ADD TTL,
-12HRS SUB.
-60,000 mt 10 pct moloo Iron
-Loading at Haldia+Vizag, EC
-Disch 1sp
-Laycan 5 - 15 Sept, 2011,
-Loading 6,000 mt pwwd shinc at Haldia,
8,000 mt pwwd shinc at vizag,
-Disch 15,000 mt pwwd shinc,
-Total 3.75 pct.
18'900 MTS m/m LESS 100 MTS CHOPT BLK AMNITRATE IMO 5.1
2500 sshex uu / 2000 sshex uu
11/13 sept
GEARLESS OK
Both gencon 5 ttl
FIRM ACC MEKATRADE
27'000 mts m/m MAP try more
Murmansk / 1,2 or 3 SP Recife-Bahia Blanca range including up river up to San Lorenzo
5000 shinc / 3000 c brasil - 3000 x argentina
8/11 sept
GEARED IMPERATIVE
5% ttl